+44 (0)1330 861016 | +44 (0)7764 940 758 Birchmoss Depot, Westhill, Aberdeenshire, AB32 6XL

REFTRADE UK supplying 10ft Freezer Container to Facilities Management Provider.

> New built container box to DNV 2-7-1/EN12079/CSC/ISO

> New Carrier Primeline equipment – Refrigeration & Freezing (-25c to +25c).

   – 12 month warranty & 36 month on all major equipment components.

> Single handle easy access door 1/3 to 2/3 split with emergency personnel release.

> Heavy duty rear protection frame for refrigeration equipment.

> Man-trap e-stop, visual & acoustic beacon recessed into external container wall.

> Emergency stop & equipment shut-off when man-trap alarm activated.

> Aluminum non-slip chequered flooring throughout.

> Internal LED lighting with 180min emergency back-up.

> 4 tier Heavy Duty Hygienic racking – Antimicrobial protection 900kg per shelf.

> Chill curtain.

> c/w set of DNV Lifting slings

> Full offshore specification paperwork supplied.

 

Build completed at our Aberdeen facility pre and post COVID-19 restrictions, performed following all Government guidelines.

 

All delivered on time and on budget as per client specifications.